HommerSimpson;1046208 said:
Looks nice.. When you will it run ?
Goal was to have it running by next weekend but looks like that might be a stretch! Work an 8-5 then work 6-12 on my stuff! But the list is pretty long:
Here is my weeks layout:
Monday:
Engine bay:
Install all hoses
Fuel:
Wire in 550 clips
Run fuel pressure gauge wiring in the bay
Mount fuel pressure regulator and run lines
FFIM:
Build base plate
Cut out sheet to start housing
Machine Flanges
Tuesday:
FFIM:
Continue building, more machining and test fitting
Exhaust:
Install Divorced DP
Install wideband and wiring
Gauges:
Run Oil pressure wiring
Cooling:
Install radiator, fan and hoses
Wednesday:
FFIM:
Continue building...
IC piping:
Build turbo to IC piping
Build flange for BOV
PCV:
Modify lines
Thursday:
Go on lift
Exhaust:
Build full exhaust
Install Driveshaft
Fill tranny with MT-90 and install shifter
Install fuel pump
Friday:
Going to Summit piont to practice
Saturday:
Racing in the 12Hrs of Summit Point in one of our shops Porsche's
So basically it will be running in two weekends!
Thanks for looking,
Seth