Ok here are some more pics. Although it might not LOOK like we did a LOT we did
While Nate and I worked on the brake system Ron and Tom did other things. Wiring for Ron and Tom filled the tranny with some Amsoil good fluid
Thanks again people for the help. Here are some pics and as I think we are closer, we still have a ton of unforseen small stuff.
To start things off, we fired one up (Nate's idea) Thanks bud as it was a good one. :rofl:
This picture is of the line lock. I wanted to mount it in a located that you can not see it. So we utilized the holes (as we did for the p side) by used one for mounting and one for the ground. We also cut off part of the bracket of the unit to make it look cleaner.
Making the custom lines for the brakes.
Now that the wiring is almost completed for the nitrous and purge I cut a hole in the frame rail (last week) and put the wires through the hole and mounted a grommet. Just have to finish the other side of the wiring on the other end. The purge valve/solenoid is now mounted as you can see and now I Just need to put the line somewhere so I can see this purge.
Ron again hiding under his helmet.. .welding the wastegate tubing.
A better pic to see how it will look. The gate has only one tube welded (partial) so need more material to complete intercooler, DP and gate.
The covers are priced on my site although they WILL rise once we get CF again.
Duane