BorHor's RHD 2JZ MK3 Build Thread.

BorHor

2JZ-GZE
Jan 10, 2006
6,181
1
0
35
San Jose, CA
Almost ready...

402385_2892351141868_1052940007_33059674_837946831_n.jpg


Car was fired up the other day to test the redone wiring harness. Harness was pulled out again to wrap it up. Finally this POS is almost ready.
 

BorHor

2JZ-GZE
Jan 10, 2006
6,181
1
0
35
San Jose, CA
Car is finally almost done. Here is a pic of the cut off from the retrofitted headlights

It is the new 6000K bulbs on the left and old 4300k on the right

430275_3046543916591_1052940007_33114814_432597687_n.jpg
 

BorHor

2JZ-GZE
Jan 10, 2006
6,181
1
0
35
San Jose, CA
They are Infiniti FX projectors. As for trimming the radiator support I am not sure. I do know a bit of trimming was done but I am not sure where it was because my friend put the lights in.
 
Last edited:

NashMan

WTF did he just wright ?
Aug 5, 2005
4,940
17
38
43
Victoria BC
BorHor;1774232 said:
So.. 6-speed and rebuild 3.73 diff all in... Engine bay is being cleaned up and parts polished right now. Aim dash in soon. Car should be done this month.. Finally.

Crappy pic of the engine bay right now.
i-qvzCKkL-L.jpg


My friend was redoing the fuel system and look what he found in the fuel tank...
378080_2434198928349_1052940007_32851701_96946293_n.jpg


that shit's bad ass I would so run that in my car, wana trade I have a sumped gas tank ?
 

NashMan

WTF did he just wright ?
Aug 5, 2005
4,940
17
38
43
Victoria BC
all send it on the next sleigh ride santa is making good with you


ps don't for get to put that thing under your pillow so the tooth fairly can pick it up for me
 

BorHor

2JZ-GZE
Jan 10, 2006
6,181
1
0
35
San Jose, CA
Sweet. I will be sleeping with it every night until it is picked up. I will keep it warm for you.
 
Last edited:

BorHor

2JZ-GZE
Jan 10, 2006
6,181
1
0
35
San Jose, CA
The shifter triangle has to be cut shorter. Ours was actually cut a bit too short so we had to cut the shifter hole a bit larger. If it is properly cut, it can fit in the stock shifter location.
 

BorHor

2JZ-GZE
Jan 10, 2006
6,181
1
0
35
San Jose, CA
Last I heard there are still wiring bugs being sorted out. Slow progress because the car was put on the back burner. Hope it is done sooner then later. It is soooooooo close to done but I still don't even know when it will hit the road.
 

BorHor

2JZ-GZE
Jan 10, 2006
6,181
1
0
35
San Jose, CA
Finally back running. Not done though. Drove it around the block with the 6-speed and it feels great! It is making 700whp which is not bad for a street car lol.

CmdMCSul.jpg


Had to do some work in the back since it was rubbing slightly. Still not sure how I got these wheels to fit.

2phG004l.jpg


I'll try and give some more updates if I can.