Because of some unforeseen circumstances, we only got some things done but it all adds up!
Might seem like nothing but ask Nate..this took a while as we wanted to plan on how things will look in the bay once it is finished. and! being careful on top of everything to make sure we don't scratch a thing.
I bought some clamps that you may have notice that surround the braided lines in some parts of the bay so I could utilize some stocks holes that I did not fill or plan on using. This will make the lines look straight and to keep them from scratching the bay. (see pic below.)
These lines are from the rear of the car. One is nitrous for the engine which will go to a solenoid and the other will end up going to the spray kit up front. I drilled and tapped the frame rail and then used billet separators to keep everything tidy.
As shown by the arrow is another holes that was not filled but only because I couldn't .... LOL good thing! I put the nitrous feed line over top of the other lines which you saw in pic above and put a clamp to hold it to make again everything look clean. The solenoids will be mounted where the T fitting is or near it.
These are the parts used. Since we did drill and tap the frame rail, we went to the hardware store to pick up some longer SS screws and then drilled the billet part out to ensure the screw will go through easily.
I don't have any pics of Ron working but trust me..he did.
Here is a pic of just some of the wiring still needed to be done LOL
Thanks again Nate and Ron for the help on the car this weekend.