One thing I am curious about is the location of my sensors. I have the AEM, AIT & MAP sensor. I also have the nozzle for the N2O. wanna make sure I don't put anything were it will not function right.
I had intentions of putting the N2O nozzle about 5 inches from the TB. And the MAP & AIT about 8 inches from the TB. Will this be right or do I need to put them else were?
From the looks of the MAP sensor I cant quite understand if it should be mounted directly to the IC pipe by drilling and screwing it on or use a vacuum line to the intake plenum on one of the vacuum ports to the nipple on the MAP sensor?
I had intentions of putting the N2O nozzle about 5 inches from the TB. And the MAP & AIT about 8 inches from the TB. Will this be right or do I need to put them else were?
From the looks of the MAP sensor I cant quite understand if it should be mounted directly to the IC pipe by drilling and screwing it on or use a vacuum line to the intake plenum on one of the vacuum ports to the nipple on the MAP sensor?