The TB should be set up in the following order:
1) Plate just fully closed, stop screw touching stop.
2) TPS adjusted (set IDL contact)
3) Dashpot adjusted. (first check it's functional)
The above is done with the linkage disconnected at the TB. Adjust the linkage and reconnect it last.
1) Plate just fully closed, stop screw touching stop.
2) TPS adjusted (set IDL contact)
3) Dashpot adjusted. (first check it's functional)
The above is done with the linkage disconnected at the TB. Adjust the linkage and reconnect it last.