Rob,
Sean, Steve and I are meeting tomorrow to install the 272's and new valve springs on the 2jz. We are meeting around 2 pm. You are welcome to come and we could buy the material for the sub box. I realize it is during the Queens game.
I placed a $500 deposit down for a chrome moly roll bar with Joe Zwilling from Rice. Custom, welded in and will be NHRA certified to 10 secs with upgrade to full cage possible if I want to go faster.
Dan
Sean, Steve and I are meeting tomorrow to install the 272's and new valve springs on the 2jz. We are meeting around 2 pm. You are welcome to come and we could buy the material for the sub box. I realize it is during the Queens game.
I placed a $500 deposit down for a chrome moly roll bar with Joe Zwilling from Rice. Custom, welded in and will be NHRA certified to 10 secs with upgrade to full cage possible if I want to go faster.
Dan