Every year around July 4th we have an extra day off for preventative maintenance where I work, and every year I spend it doing whatever I want to. This year will be spent working on my Supra and taking care of a buttload of things that should've been done a long time ago. Here's my list:
1. Install Eibach lowering springs (before and after pics to come!)
2. New brake pads all around
3. Adjust E-brake (doesn't work at all)
4. Install SAFC II
5. Install Blitz turbo timer
6. Install stock intercooler that I just flushed, straightened and painted
7. Raise exhaust (cause she's bottoming out a lot these days)
8. Take a serious look at timing - possible cause of sad dyno numbers
9. Install new radio antenna
10. Hardwire in a triple accessory outlet
I should have some help for the springs, but it's a pretty long list for a day - at least for somebody who usually takes his time and tries to get it right the first time. Any bets on how far I can get? I'm afraid it won't be far...
1. Install Eibach lowering springs (before and after pics to come!)
2. New brake pads all around
3. Adjust E-brake (doesn't work at all)
4. Install SAFC II
5. Install Blitz turbo timer
6. Install stock intercooler that I just flushed, straightened and painted
7. Raise exhaust (cause she's bottoming out a lot these days)
8. Take a serious look at timing - possible cause of sad dyno numbers
9. Install new radio antenna
10. Hardwire in a triple accessory outlet
I should have some help for the springs, but it's a pretty long list for a day - at least for somebody who usually takes his time and tries to get it right the first time. Any bets on how far I can get? I'm afraid it won't be far...