What is the proper way to pre load the arp bolts/studs before the finale tq down? I spoke with arp 3 times and got 3 different answers. First chap said to tq them down and not worry about the pre load. Second one said to do 5 pre load cycles. 3rd said to do 3 pre load cycles. One said one bolt at a time, other said loosen all uniformly...
IJ- No offense, i just need more input to feel confident in my decision at this point.
Right now I am going to follow advice given and tq them down and do a simple re-tq after 5 heat cycles.
If i were to pre load the studs with moly lube, is this correct?
tq all studs down to 90% of arp spec'ed 85ftlb tq using tsrm sequence. Back all off using tsrm sequence 1/2 a turn (I was advised to avoid relieving total pressure on HG) tq all back to 76.5ftlbs. back off 1/2turn. tq all back to 76.5, etc. until final cycle and go to 85ftlbs.
How many cycles for used studs? does the use of a composite gasket affect final TQ value?
IJ- No offense, i just need more input to feel confident in my decision at this point.
Right now I am going to follow advice given and tq them down and do a simple re-tq after 5 heat cycles.
If i were to pre load the studs with moly lube, is this correct?
tq all studs down to 90% of arp spec'ed 85ftlb tq using tsrm sequence. Back all off using tsrm sequence 1/2 a turn (I was advised to avoid relieving total pressure on HG) tq all back to 76.5ftlbs. back off 1/2turn. tq all back to 76.5, etc. until final cycle and go to 85ftlbs.
How many cycles for used studs? does the use of a composite gasket affect final TQ value?