BorHor said:
I'll probably have my set done in the next week. Testing on my USDM set first.
Unless you have lot of free time and all the part ready, you won't get it done in a week.
I did most of my planning/design/research/shopping on the PC for about over a month. Prototype on a perforated board take another week. Print/etch/drill the boards take another weeks.
If you can afford to not driving the supra for couple weeks, it can be done
. I have another car to drive around that is why I take my time to perfect the project. Also having a full time job and having a little boy copy whatever you do make thing go a lot slower
.
Prototype stage is one that consumes lots of your down time. I mean, you solder the led on the board, put it on the tail to see if it look good or bright/dark enough. Depend what it is, you have to go back to the drawing board again and the circle start until you happy with what coming out.
Tekdues did his on a perf-board so it doesn't take as long as etching a coper clad board.