Here's the story:
Spent the last 6 weeks doing this job, sub contracting under a subcontractor... Basically, Im trying to avoid getting effed in the A... The big company, PKC, hired US Drywall Specialties (USDS) to build a WingStop... Well, USDS hired me, my company, Emerald Coast Drywall & Texture (ECD&T) to pretty much do it all... I did it all... Now, PKC owes me $7700... However, they have thier contract with USDS, not me... So they are saying that the remaining balance owed to USDS is $3200... However, I have $4500 in change order work... I come to find out that even though I was told to do all the change order work, no contract from PKC was made to USDS for the work to be done... Of course, PKC was happy as balls when they heard the work was done...
Anyway, I've got about $3500 in payroll, they say they are only going to pay $3200... WTF are my options? Lien? If so, WHO do I lien? USDS for not getting the contracts for the change orders? PKC? WingStop? I dont know... Im so pissed off, because I seriously busted my ass for these assholes and this is the repayment I get... A fuckin loop hole... They didnt tell me change orders needed contracts, but they sure werent in a hurry to stop me from fixing all the damage that happened... *holes in the roof, water everywhere, it was a mess, but Jake saved the day*
Anyway, any advice would be great...
Spent the last 6 weeks doing this job, sub contracting under a subcontractor... Basically, Im trying to avoid getting effed in the A... The big company, PKC, hired US Drywall Specialties (USDS) to build a WingStop... Well, USDS hired me, my company, Emerald Coast Drywall & Texture (ECD&T) to pretty much do it all... I did it all... Now, PKC owes me $7700... However, they have thier contract with USDS, not me... So they are saying that the remaining balance owed to USDS is $3200... However, I have $4500 in change order work... I come to find out that even though I was told to do all the change order work, no contract from PKC was made to USDS for the work to be done... Of course, PKC was happy as balls when they heard the work was done...
Anyway, I've got about $3500 in payroll, they say they are only going to pay $3200... WTF are my options? Lien? If so, WHO do I lien? USDS for not getting the contracts for the change orders? PKC? WingStop? I dont know... Im so pissed off, because I seriously busted my ass for these assholes and this is the repayment I get... A fuckin loop hole... They didnt tell me change orders needed contracts, but they sure werent in a hurry to stop me from fixing all the damage that happened... *holes in the roof, water everywhere, it was a mess, but Jake saved the day*
Anyway, any advice would be great...