Can ya'll please help me with some time estimates??
Was going to wait, but thinking I may still try to do the rest of my fuel system. Worried that I don't have enough time before the TX2K12 meet... Seems like I need to finish it, if I get started. I searched and will take much more time to sort through the individual threads, than to do the actual work ;-)
I have the USDM injectors & rail, Acura/Honda resistor pack w/connector & pigtail, 2JZ GE head set (may have new injector grommets), and an Innovate WB kit (gauge, sensor, etc). Walboro been installed for a few years.
I may have to pull the intake back, since I also somehow disconnected the rear knock sensor. Fing thick forearms :-/, tho will have Satan's get on top and try ;-), I could drop the USDM rail/injectors in while I have the intake pulled back.
Please break up the time estimates. I may not have all the time at once, but may be able to spread it over the next few days. My initial estimate...
1. Pulling intake back - 4omin?
2. Installing USDM 550s injectors & rail - 20 min with intake pulled back already
2. Soldering in the Acura/Honda resistor pack w/connector & pigtail (I know exactly where I will cut/solder the injector wires) - 20 min
3. Install/calibrate Innovate WB kit - I can temporarily leave gauge unmounted (connected, lying in the glovebox) - 1 hour??
Was going to wait, but thinking I may still try to do the rest of my fuel system. Worried that I don't have enough time before the TX2K12 meet... Seems like I need to finish it, if I get started. I searched and will take much more time to sort through the individual threads, than to do the actual work ;-)
I have the USDM injectors & rail, Acura/Honda resistor pack w/connector & pigtail, 2JZ GE head set (may have new injector grommets), and an Innovate WB kit (gauge, sensor, etc). Walboro been installed for a few years.
I may have to pull the intake back, since I also somehow disconnected the rear knock sensor. Fing thick forearms :-/, tho will have Satan's get on top and try ;-), I could drop the USDM rail/injectors in while I have the intake pulled back.
Please break up the time estimates. I may not have all the time at once, but may be able to spread it over the next few days. My initial estimate...
1. Pulling intake back - 4omin?
2. Installing USDM 550s injectors & rail - 20 min with intake pulled back already
2. Soldering in the Acura/Honda resistor pack w/connector & pigtail (I know exactly where I will cut/solder the injector wires) - 20 min
3. Install/calibrate Innovate WB kit - I can temporarily leave gauge unmounted (connected, lying in the glovebox) - 1 hour??