I went to install my PTE 680cc injectors today and noticed something unusual. The o-ring on the top to the fuel rail fits snug but the bottom one to the head is very loose.Theres a about 1mm of play in it. Is there a special o-ring Im supposed to use or will it be fine when I bolt it on?