Ebay rebuilt engine

bigaaron

Supramania Contributor
Apr 12, 2005
4,692
1
0
49
Pomona, CA
www.driftmotion.com
I edited it to point out some important info.


Part: THIS IS A USED ORIGINAL TOYOTA ENGINE THAT HAS BEEN (SORT OF) REBUILT. IT IS A 7MGTE MOTOR THAT IS USED IN THE 1987-1992 TOYOTA SUPRA TURBO. THIS LONBLOCK INCLUDES NEW PISTON RINGS, MAIN BEARINGS,ROD BEARINGS,THRUST WASHERS,OIL PUMP(TOYOTA OEM?),TIMING BELT,TIMING BELT TENSIONER,WATER PUMP,VALVE SEALS,HEAD GASKET(TOYOTA OEM?),FACTORY HEAD BOLTS,WATER PUMP,VALVE COVER GASKETS,VALVE COVER GROMMETS, CAM SEALS, OIL PUMP SEAL, FRONT CRANK SEAL,REAR MAIN SEAL, OIL PAN GASKET SEALANT, AND PLATINUM SPARK PLUGS. THE BLOCK IS CLEANED, CYLINDERS HONED (WITH A BOTTLE BRUSH),AND DECK FILED (?). THE CYLINDER HEAD IS CLEANED, CHECKED, RESURFACED (WHAT SURFACE RA CAN THEY PRODUCE?),AND HAS NEW VALVE SEALS INSTALLED (BUT NO VALVE JOB OR VALVE ADJUSTMENT IS DONE). THE CRANKSHAFT , CONNECTING RODS, AND PISTONS ARE CLEANED AND CHECKED FOR CRACKS OR ANY SIGNS OF ABNORMAL WEAR BEFORE REASSEMBLY (BUT NOTHING ELSE IS DONE TO THESE PARTS OTHER THEN VISUAL INSPECTION).THIS IS A QUALITY REBUILD PERFORMED BY TRAINED TOYOTA TECHNICIANS (GOOD TOYOTA TECHNICIANS WOULD RECOMMEND THE RODS ARE RESIZED AND CRANK IS POLISHED). THIS LONBLOCK IS WARRANTEED FOR 12 MONTHS OR 12000 MILES UNDER STOCK BOOST CONDITIONS. ALSO WE HAVE A UPGRADE PACKAGE INCLUDING ARP HEAD BOLTS AND A HKS METAL HEAD GASKET FOR A ADDITIONAL CHARGE.(HOW MUCH?) WE DO REQUIRE YOUR USABLE CORE OR A ADDITIONAL CORE CHARGE OF $400.00 MAY APPLY(ADD ABOUT $250 TO THE PRICE TO SHIP YOUR CORE OUT). WE USUALLY SHIP WITHIN 2-3 WORKING DAYS. THANK YOU FOR LOOKING!

So basically the only real machine work done to the entire engine is surfacing of the block and head.
 
Last edited:

bigaaron

Supramania Contributor
Apr 12, 2005
4,692
1
0
49
Pomona, CA
www.driftmotion.com
I think your idea of a rebuild and my idea of a rebuild differ drastically. :biglaugh: I'm just messin with ya Cryo :icon_razz

But being serious now, you can save a lot of money if you have the time, tools, and resources to do a complete rebuild yourself.
 
Last edited:

supradan22

NA->TER
May 20, 2005
915
0
16
ORLANDO FL
I gotta look at the receipt but I spent about 800 bucks on machine work I had everything redone, Crank cut head and deck a little cylinder bore job and hot tanked it and cleaned the head.
 
C

cnewingham

Guest
I too spent about $1200 on machine work for my block and head alone