Guy's something wrong with the supra internally. So I was going to rebuild it. Whats a budget safe way of going about this? I need help. Any suggestions would be a great help.
 

rakkasan

Currahee!!
Mar 31, 2005
2,997
0
36
54
Fort Campbell, KY
I don't know of a way to plan a rebuild without tearing the motor apart first. You could have a multitude of problems, but you won't know until you crack the motor open.
 

Idealsupra

Supramania Contributor
Mar 31, 2005
2,390
0
0
41
Orlando
www.tampabaysupras.com
budget......rebuild.....and supra...... those words dont go together...

so you can do it right the first time and spend some cash....OR you can do it on a "budget" and do it twice and end up spending more then your budget anyways....
 

JT87NA

New Member
Mar 30, 2005
171
0
0
42
SLC, UT
Yup, 3,000 is a good number, my machine work alone was around 1,500 and that doesn't include a head job since the head only had 15k on it. Just got it milled and got the valves vacuum checked.
 

aye mate

Hiatus over.
Mar 30, 2005
1,926
0
0
Maryland
IJ. said:
JT: I hope your machinst is better looking than mine ;)!
hahaa, freakin Ian. :biglaugh:

Grim: What did you rebuild for $3k? Is that OEM rods and pistons, machining, hardware, and gaskets?
 

GrimJack

Administrator
Dec 31, 1969
12,377
3
38
56
Richmond, BC, Canada
idriders.com
Actually, mine cost me less than that, as I was able to use OEM pistons and rods I already had on hand. I polished the crank, honed the cylinders, skimmed the surface on the block and the head, and had the head flattened in an oven.

Then I added new Clevite bearings and thrust washers, Hastings rings, Toyota waterpump, all new frost plugs, all new seals, and about $1 of shims for my oil pump.

Oh, and about 3 weeks of cleaning individual parts and another $100 in PAINT.
 

TONY!

Habitual Supra Killer
Mar 30, 2005
524
6
18
Tonyland
Just for giggles, I typed up a realistic estimate of what it would cost me to build up my engine.
I also did an estimate if someone were to buy it from where I left off.

This is for the long block only and does not include belts, hoses, or anything else that you would want to change on the way, however a complete engine gasket is added in the equation.


If I were to build my motor to stock specs it would cost me about.

$75 deck the block
$60 hone the cylinders

$200 valve job
$60 mill the head

$315 complete Toyota gasket set
$110 rings
$180 bearings
$28 oil pump drive shaft bearing set
$140 Cometic MHG
$105 head bolts from ARP
$15 FIPG for the oil pan
$5 assembly lube
$50 *probably the cost of main and rod bolts from Toyota*
$30 *probably the cost for me to get valve shims from a machine shop*
$ 28 TAX from machine shop
$ 30 estimate on shipping
$1431 TOTAL FOR ME TO REBUILD THE COMPLETE ENGINE

If someone took over the job from where I left off with some shopping:

$600 complete long block components package
$254 MAX shipping of my engine parts
$80 max for cleaning the block and head after machine work (I would have had that free).
$2365 for a Complete Long Block that has already been inspected and known to be good.