just curious what others have done for this setup, i was planning sumping the tank in the front half of the gas tank and then hose's following this AN -10 off the sump of the tank its -10 all the way up to a "Y" then it breaks down to 2 -8 on the "Y" which feed the rail from both ends. -8an return with a stock fuel rail or high flow LIPP rail